An administrator needs to move a Nutanix host from one cluster to another. Which step should the administrator take after evacuating VMs from the host to be moved?
A. From the Task menu in Prism, select Cluster details, then un-check the host from the list
B. In Prism, highlight the host in the Hardware pane and select Remove Host
C. In Prism, highlight the host in the Hardware pane and select Remove from Metadata Ring
D. From the Task menu in Prism, select Licensing hen delete the host license.
A customer needs a tool packaged as a VM that uses realistic workloads paired with realworld test scenarios for HCI environments. The goal is to benchmark performance during typical workflows and failure events. Which Nutanix tool meets these requirements?
A. Foundation
B. Move
C. X-Ray
D. Cluster Check
A prospect customer's expected workload consists of the following: 110 vCPU 512GB RAM * 500TB Storage They need a solution to help decrease storage costs. The majority of their storage requirements come from an imaging application that stores scanned JPEG images. Which two Nutanix capabilities should be leveraged? (Choose two.)
A. Erasure Coding
B. Storage-Only Nodes
C. Capacity Tier Deduplication
D. Compression
When using Nutanix Sizer, which solution does the Automatic sizing option provide?
A. The lowest cost solution that meets the provided requirements
B. A solution that balances cost and performance, plus a default 25% growth capacity
C. The highest performance solution that meets the provided requirements
D. A solution that meets provided requirements, plus a default 25% growth capacity
Refer to Exhibit:
A. Reseat all disk immediately. If this does not help, reseat the nodes
B. Check status of applications running on the cluster and call support
C. Resolve all alerts and re-import the disks to make sure there is no service disruption.
D. Restart all CVMs for the cluster to check, confirm health and repartition and add the disks.
A prospective customer wants to refresh their current on-premises infrastructure that. consists of 4 ESXi hosts. each with 20 cores and 512GB of RAM, and 1.2PB of usable SAN storage They have recently renewed their ESXi licensing, and all data must remain within their physical network. They are concerned that a hyperconverged solution will not meet their storage requirements without requiring a significant increase in the number of required ESXi hosts and licenses. Which Nutanix capability should the systems engineer review with the customer?
A. Replace the hypervisor with AHV
B. Build Cluster on a public cloud
C. Position storage-only nodes
D. Use Volumes to provide storage
A customer asks for a quote for a hybrid cluster to run general purpose VMs and an ERP application. The customer has a vSAN ReadyNode quote already and is looking for a comparable Nutanix solution. They share the following bill of materials: 3 Hosts , 2x E5- 2640v4 CPUs , 512GB RAM , 1 x 480GB SSD , 2 x 8TB HDD , 2 x 1GB NIC What are two reasons to avoid sizing to match a competitor's bill of materials ? (Choose two)
A. Sizing data from the competition was shared.
B. There is no visibility to the actual customer requirement
C. The assumptions made in the competitor's sizing cannot be determined.
D. Nutanix Collector is better at capturing the metrics needed
An SE is working with a financial institution prospect on a VDI environment refresh. The institution currently has 5000 named VDI users, with a peak of 2800 concurrent users. How many VDI VMs does the SE need to size for, factoring in an additional 10% for growth?
A. 2880
B. 3080
C. 5000
D. 5500
An online retailer currently support over 200 separate PostgreSQL database instances, often with more than 10 copies of each individual database. Their Database Administrators have scripted much of the deployment process for creating dev/test copies, but their infrastructure team struggles to keep up with storage capacity demands. Which Nutanix product should the systems engineer position?
A. Beam
B. Karbon
C. Calm
D. Era
An administrator has been alerted to a VM that has high I/O latency and wants to determine if there are any other factors, such as insufficient network or memory resources that correlate, as part of a troubleshooting process. Which type of chart should the administrator create to allow all relevant data to be easily exported to CSV for later analysis?
A. A VM entity chart with each of the relevant metrics.
B. A cluster metric chart for each of the relevant metrics
C. A cluster entity chart with each of the relevant metrics
D. A VM metric chart for each of the relevant metrics
A System engineer (SE) is gathering requirements to size a hybrid cluster to replace a prospect's existing IT test and development environment. The prospective customer has indicated the cluster contains no business critical applications and has provided the aggregate vCPU and RAM requirements of the existing cluster. which two additional items does the SE require to size the cluster? (Choose two)
A. Existing Drive Count
B. Virtual Switch Configuration
C. Working Data Set
D. Storage Capacity
Which two Citrix desktop creation capabilities are supported on Nutanix AHV? (Choose two)
A. Provisioning Service
B. System Center Virtual Machine Manager
C. Composer
D. Machine Creation Services
E. Desktop Delivery Controller
Page 5 out of 17 Pages |