The following question requires your selection of CCC/CCE Scenario 4 (2.7.50.1.1) from
the right side of your split screen, using the drop down menu, to reference during your
response/choice of responses.
What is the cost index value of copper at the end of Year 2? (rounded to 2 decimal
positions)
A. 4.62
B. 4.24
C. 4.10
D. 4.31
A work breakdown structure (WBS) is developed because:
A. It avoids omissions of key product activities through a systematic planning process; removes the complexity of the project by dividing it into manageable units; and provides a framework.
B. It defines specific tasks within a project from which schedules can be developed; it aids in linking activities with resources; it facilitates communication; and it allows integration of project plans
C. It can be illustrated by individual bars for major phases, such as permitting, funding, engineering, procurement construction, commission/startup
D. It can be illustrated by a simple bar, with important milestones represented by symbols at the planned time of occurrence
If a project is said to be on a "fast track program/' the fast track method is:
A. Simultaneous working engineering, procurement, and construction, with appropriate overlap from each phase of work so that delays are eliminated and all the work is streamlined into a correct plan of logic/sequence and duration for all of the work
B. First completing engineering and procurement, then executing construction
C. Analyzing the project and specifying the basic approach to be used in its execution; segmenting the project into reasonable number of activities; estimating the time required to perform each activity; placing the activities in time order, considering both sequential and parallel performance
D. Revising the schedule logic to make it possible to identify constraints of faulty logic; revising the durations in the n p schedule that have been based on assumptions regarding the \hay the work would be performed; revise the resources to work multiple shifts; evaluate the use of overtime
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data. Which of the following is least likely to improve a large earthmoving contractor's productivity?
A. Using apprentice operators to save labor costs
B. Starting summer work in the early morning hours to minimize work during peak heat periods of the day
C. Remove underground hazards prior to excavation work
D. Replacing old excavators with new, larger excavators
The latest allowable end time minus the earliest allowable end time on a schedule activity is referred to as:
A. Total float
B. Remaining duration
C. Free float
D. Just-in-time scheduling
Which of the following is used for measuring productivity loss?
A. Central limit theorem
B. Value engineering
C. Earned formula
Two of the most important things to know when planning a speech or lecture are the ______________and______________ of your audience.
A. Motivation, professionalism
B. Background, attitude
C. Political preference, sense of humor
D. Culture, understanding
A used concrete pumping truck can be purchased for $125,000. The operation costs are expected to be $65,000 the first year and increase 5% each year thereafter. As a result of the purchase, the company will see an increase in income of $100,000 the first year and 5% more each subsequent year. The company uses straight-line depreciation. The truck will have a useful life of five (5) years and no salvage value. Management would like to see a 10% return on any investment. The company's tax rate is 28%. The compound interest factor used to determine Present Value in year number 5 is:
A. 0.3790
B. 0.6209
C. 1.6051
D. 0.6830
SCENARIO: A can manufacturing company requested you to provide data for their decision making The unit prices of the can varies but an average selling price of $0.55 cents and average cost of S45 cents is estimated. The monthly fixed costs are: Rant-$1,500 Wages - $4.000 Miscellaneous fixed expenses - $500 If the rent increases by 100% and the unit sales/other costs remain unchanged, the new break even amount is?
A. $60,000
B. $41,250
C. $33,000
If you deposit $100 per month for two (2) years and earn interest at 12% APR (Annual Percentage Rate) compounded monthly, how much will you have at the end of the period?
A. $2,424
B. $2,976
C. $2,688
D. $2,697

The following question requires your selection of CCC/CCE Scenario 2 (2.3.50.1.2) from
the right side of your split screen, using the drop down menu, to reference during your
response/choice of responses.
9,375 hours have been expended to date. Planned completion at this time is 75%. The
project is determined to be 66% complete. Based on current trends, how many hours will
be expended at project completion?
A. 16,215
B. 14,201
C. 12,000
D. 10,526
Which of the lol owing comparisons is commonly used in forensics schedule analysis (FSA)?
A. Cost performance index (CPI) to schedule performance index (SPI)
B. Forensic productivity analysis
C. Earned value vs scheduled value
D. As-planned vs as-built
| Page 5 out of 19 Pages |
| 234567 |
| CCP Practice Test Home |
Real-World Scenario Mastery: Our CCP practice exam don't just test definitions. They present you with the same complex, scenario-based problems you'll encounter on the actual exam.
Strategic Weakness Identification: Each practice session reveals exactly where you stand. Discover which domains need more attention, before Certified Cost Professional (CCP) Exam exam day arrives.
Confidence Through Familiarity: There's no substitute for knowing what to expect. When you've worked through our comprehensive CCP practice exam questions pool covering all topics, the real exam feels like just another practice session.